1. Get a short section of pipe, I.D. slightly larger than the gusset.
2. File or grind open end to a sharp edge
3. Lay ply on a hard Member 60 backup.
4. Place pipe sharp edge down on ply sheet
5. Place a Member 60 block on top end of pipe
6. Whack with hammer - force to be determined by trial and error
7. clean up edges of punched out gussets, cut to desired section
Chris
On [phone]:19 AM, Member 62 wrote:
> Hi Member 67,
>
> I was puzzling over a detail on the rudder actuator assembly over the
> last couple of days. According to the drawing on sheet 26, the rudder
> actuator is fixed to the rudder by means of one M6 and 3 M5 bolts,
> while the detail of the actuator drawn on sheet 27 shows the M6 bolt
> as being M5. Which did you end up using ?
>
> A secondary question to all and sundry, is there a recommended way to
> produce all the quarter- and semi-circular gussets for the rudder and
> elevator ribs ? Cut slightly over-size with scissors, then sand down
> to size ? Cut with a knife instead of scissors ? Does anyone know if
> these could be laser cut, or if the heat would damage the glue layer
> and weaken the ply too much ? If laser cutting is an option, then my
> local FabLab would be a good place to visit...
> (www.fablabmanchester.org in my case, but there are similar setups in
> many towns in many countries I believe).
>
> Thanks all.
>
> Member 62
> _______________________________________________
> ULF-1 discussion list -- [email]
>
> Subscribe, Unsubscribe, Preferences, List information:
> http://lists.ulf-1.com/listinfo.cgi/ulf-1-ulf-1.com
>
>
>